Long-Lead Temperature Sensor. Replacement accessory for the laboratory instrument configuration specified below. Use the selected instrument model and the existing component dimensions or connector details to confirm the correct replacement.
Key features
- Long-Lead Temperature Sensor
- 18B20
Technical Information
| Accessory model | T-AGN-001 |
|---|
| Minimum order quantity | 1 |
|---|
| Documented specification | 18B20 |
|---|
Download the detailed product datasheet for full specifications and configuration information.
Standard Configuration
Supply of the selected accessory, in the confirmed order quantity. The host instrument and other accessories are excluded unless itemized in the quotation.
Optional Accessories
Related replacement parts are quoted separately after compatibility review. No unlisted fitting or installation service is assumed included.
Selection / Ordering Information
Include the PRECETTA instrument model, serial number, component photograph and required quantity in the inquiry. The photograph identifies the accessory type; confirm the exact ordered variant against its specification before procurement.
Downloads
Download the detailed product datasheet for full specifications and configuration information.
Download PDF — English · PDF